Nova:Mossow-Neverwinter Iceway: Difference between revisions

From EarthMC
Jump to navigation Jump to search
>Wediaklup
No edit summary
No edit summary
 
(29 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Iceway|type=International|completion_date=31st December 2019 – <br>23rd February 2021|builders=[[File:NoSkinForLife.png|20px]] NoSkinForLife
{{Iceway|type=International|completion_date=27th January 2020– <br>23rd February 2021|builders=[[NoSkinForLife]]
[[File:Diamant.png|20px]] [[DiamantAxt9494]]|patroller=[[File:Diamant.png|20px]] [[DiamantAxt9494]]|total_distance=ca. 4100 blocks|stations=4|nations={{KAPSKFlag}} [[KAPSK]]
[[File:Diamant.png|20px]] [[DiamantAxt9494]]|patroller=[[File:Diamant.png|20px]] [[DiamantAxt9494]]|total_distance=ca. 4100 blocks|stations=8|nations={{KAPSKFlag}} [[KAPSK]]<br />[[A.A.T]] <small>(past)</small><br />[[Valkyrie]] <small>(past)</small>|continent=Antarctica|level=Tunnel; Bridge|row12={{Template:Nova:Mossow-Neverwinter Iceway Route}}
[[A.A.T]] <small>(past)</small>
|image1=[[File:MossowNeverwinterThumbnail.png|380px]]|caption1=Ice road near Mossow (before renovation)}}


[[Valkyrie]] <small>(past)</small>|continent=Antarctica|level=Tunnel; Bridge|row12={{TEndU}} Mossow Elchwinkel Rd.
The '''Mossow – Neverwinter Iceway''' is a route composed of two individual ice roads. The first section was completed on 27 January 2020 and the whole Iceway finished on 23rd February 2021. It leads from [[Mossow]], where it goes through the Mossow Iceway tunnel, via [[Shrek]] to [[Neverwinter]].
{{TIntUL}} <small>To [[ImDoneWEarthMC]]</small>


{{TStation}} Mossow IRS
== Route==
The Route starts at Y 7 in the Mossow Iceway Tunnel in the Station of Mossow Elchwinkel Rd. Going South for a few metres and then turning left at an Intersection the Iceway reaches Mossow IRS. A hundred blocks east of the station the Iceway reaches an elevator which brings the Users up 160 blocks. From there the Iceway goes about 3000 blocks east, passing several maparts, until it reaches the past town of Shrek which marks the end of the first section which was completed on 27 January 2020. In Shrek the iceway makes a turn to the north and a few blocks further another turn to the east again. Here it passes an intersection and goes a thousand blocks east again. After these thousand blocks in turns north at an intersection and reaches it's end, the past town of Neverwinter, 500 blocks further north.


{{TIntUR}} <small>To [[Mossow-New Snork Iceway|Mossow East]]</small>
==History==


{{Tunnelexit}}
===Initial Construction===


{{IWCrafting}}
====[[Shrek]] – [[Mossow]]====
The construction of the First Section began on 16th December 2019 when Diamant planned on building an Ice Road to Australia via Shrek. Diamant couldn't contact the Shrek Administration to ask for permission until 29th December 2019 when the ice road was a bit more that halfway completed. From that day on [[NoSkinForLife]] helped with the construction of the ice road. It was completed on 27 January 2020.


{{IWService}} <small>Stairs to the Ground</small>
====[[Shrek]] – [[Neverwinter]]====
 
The construction of the Shrek – Neverwinter section is not documented, however its assumed that it was completed in December of 2019.
{{IWBorder}} <small>[[KAPSK]] Nation Border</small>
[[Category:Infrastructure]]
 
[[Category:Antarctica]]
{{IWTrack}}
[[Category:KAPSK]]
 
[[Category:Casey]]
{{IWStation}} [[Shrek]]
[[Category:Volksbundesbahnen]]
 
{{IWIntUR}} <small>To Australia</small>
 
{{IWTrack}}
 
{{IWIntUL}} <small>Stub Line</small>
 
{{IWTrack}}
 
{{IWEndD}} Neverwinter}}
 
The '''Mossow Neverwinter Iceway''' is a route composed of two individual ice roads. The first section was completed on 31st December 2019 and the whole Iceway finished on 23rd February 2021. It leads from [[Mossow]], where it goes through the Mossow Iceway tunnel, via [[Shrek]] to [[Neverwinter]].
 
== Route ==
The Route starts at Y 7 in the Mossow Iceway Tunnel in the Station of Mossow Elchwinkel Rd. Going South for a few metres and then turning left at an Intersection the Iceway reaches Mossow IRS. A hundred blocks east of the station the Iceway reaches an elevator which brings the Users up 160 blocks. From there the Iceway goes about 3000 blocks east, passing several maparts, until it reaches the past town of Shrek which marks the end of the first section which was completed on 31st December 2019. In Shrek the iceway makes a turn to the north and a few blocks further another turn to the east again. Here it passes an intersection and goes a thousand blocks east again. After these thousand blocks in turns north at an intersection and reaches it's end, the past town of Neverwinter, 500 blocks further north.
 
== History ==
 
=== Initial Construction ===
 
==== [[Shrek]] [[Mossow]] ====
The construction of the First Section began on 16th December 2019 when Diamant planned on building an Ice Road to Australia via Shrek. Diamant couldn't contact the Shrek Administration to ask for permission until 29th December 2019 when the ice road was a bit more that halfway completed. From that day on [[NoSkinForLife]] helped with the construction of the ice road. It was completed on New Years Eve 2019.
 
==== [[Shrek]] [[Neverwinter]] ====
Work in progress...

Latest revision as of 17:26, 28 October 2023

Mossow-Neverwinter Iceway
MossowNeverwinterThumbnail.png
Ice road near Mossow (before renovation)
General Information
Type International
Completion Date 27th January 2020–
23rd February 2021
Builder(s) NoSkinForLife

Diamant.png DiamantAxt9494

Patroller(s) Diamant.png DiamantAxt9494
Total Distance ca. 4100 blocks
Stations 8
Geographical Information
Nation(s) Flagge4.png KAPSK
A.A.T (past)
Valkyrie (past)
Continent Antarctica
Level Tunnel; Bridge
Route Information
TEndeOben.png 2.83 Mossow Elchwinkel Rd.
TAbzwObenLinks.png 2.87 To ImDoneWEarthMC
TBahnhof.png 2.84 Mossow IRS
TAbzwObenRechts.png 2.79 To Mossow East
TBahnhof.png 2.71 Mossow Airport
Ausgang.png
OStrecke.png 2.58 Stairs to the Ground
OStrecke.png 2.47 Stairs to the Ground
OStrecke.png 2.18 Stairs to the Ground
OStrecke.png 1.96 Stairs to the Ground
ONNG.png 1.90 Neuwittstock
OStrecke.png 1.84 Stairs to the Ground
OStrecke.png 1.83 Stairs to the Ground
TBhTr.png 1.80 Treeburg
OStrecke.png 1.70 Stairs to the Ground
OStrecke.png 1.65 Stairs to the Ground
IWCrafting.png 1.52
OStrecke.png 1.49 Stairs to the Ground
OStrecke.png 1.38 Stairs to the Ground
IWCrafting.png 1.28
OStrecke.png 1.07 Stairs to the Ground
ONNG.png 0.83 Le F
OStrecke.png 0.72 Stairs to the Ground
IWCrafting.png 0.66
Staatsgrenze.png 0.50 KAPSK Nation Border
ONNG.png 0.49 Shrek a Ovest
OStrecke.png 0.42 Stairs to the Ground
OStrecke.png 0.31 Stairs to the Ground
Bahnhof.png 0.00 Shrek
AbzwObenRechts.png To Australia
OStrecke.png
AbzwObenLinks.png Stub Line
OStrecke.png
EndeÜberUnten.png Neverwinter


The Mossow – Neverwinter Iceway is a route composed of two individual ice roads. The first section was completed on 27 January 2020 and the whole Iceway finished on 23rd February 2021. It leads from Mossow, where it goes through the Mossow Iceway tunnel, via Shrek to Neverwinter.

Route

The Route starts at Y 7 in the Mossow Iceway Tunnel in the Station of Mossow Elchwinkel Rd. Going South for a few metres and then turning left at an Intersection the Iceway reaches Mossow IRS. A hundred blocks east of the station the Iceway reaches an elevator which brings the Users up 160 blocks. From there the Iceway goes about 3000 blocks east, passing several maparts, until it reaches the past town of Shrek which marks the end of the first section which was completed on 27 January 2020. In Shrek the iceway makes a turn to the north and a few blocks further another turn to the east again. Here it passes an intersection and goes a thousand blocks east again. After these thousand blocks in turns north at an intersection and reaches it's end, the past town of Neverwinter, 500 blocks further north.

History

Initial Construction

ShrekMossow

The construction of the First Section began on 16th December 2019 when Diamant planned on building an Ice Road to Australia via Shrek. Diamant couldn't contact the Shrek Administration to ask for permission until 29th December 2019 when the ice road was a bit more that halfway completed. From that day on NoSkinForLife helped with the construction of the ice road. It was completed on 27 January 2020.

ShrekNeverwinter

The construction of the Shrek – Neverwinter section is not documented, however its assumed that it was completed in December of 2019.