Classic:Alania Metro: Difference between revisions
Jump to navigation
Jump to search
>PBB-alania No edit summary |
>PBB-alania No edit summary |
||
Line 2: | Line 2: | ||
== History == | == History == | ||
[[File:Metro Map I.png|thumb|NaNxNaNpx]] | |||
Founded on 27/01/2018 to build and run the Metro rail system under Alania | Founded on 27/01/2018 to build and run the Metro rail system under Alania | ||
Revision as of 20:44, 4 April 2018
History
Error creating thumbnail: File with dimensions greater than 12.5 MP
Founded on 27/01/2018 to build and run the Metro rail system under Alania
Lines
Armenian Line
First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and then with the Western Armenian City.
Tbilisi Line
Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea.
Castle Line
Third Line built, runs from the Grand Terminal underneath the Eastern sections of Alania and continues to the Alanian Castle.