Classic:Alania Metro: Difference between revisions

From EarthMC
Jump to navigation Jump to search
>PBB-alania
No edit summary
>PBB-alania
No edit summary
Line 2: Line 2:


== History ==
== History ==
[[File:Metro Map I.png|thumb|NaNxNaNpx]]
Founded on 27/01/2018 to build and run the Metro rail system under Alania
Founded on 27/01/2018 to build and run the Metro rail system under Alania



Revision as of 20:44, 4 April 2018


History

Error creating thumbnail: File with dimensions greater than 12.5 MP
NaNxNaNpx

Founded on 27/01/2018 to build and run the Metro rail system under Alania

Lines

Armenian Line

First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and then with the Western Armenian City.

Tbilisi Line

Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea.

Castle Line

Third Line built, runs from the Grand Terminal underneath the Eastern sections of Alania and continues to the Alanian Castle.

Mountain Line