Classic:Alania Metro: Difference between revisions

From EarthMC
Jump to navigation Jump to search
>PBB-alania
No edit summary
m (515797455988850689 moved page Alania Metro (Classic) to Classic:Alania Metro)
 
(4 intermediate revisions by 3 users not shown)
Line 2: Line 2:


== History ==
== History ==
Founded on 27/01/2018 to build and run the Metro rail system under Alania
Founded on 27/01/2018 to build and run the Metro rail system under [[Alania]]. The system is fully functional and used by town members extensively as a quick way to get around the town.


== Lines ==
== Lines ==


=== Armenian Line ===
=== Armenian Line (Rhomahan Line) ===
First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and then with the Western Armenian City.
First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and then with the Western Armenian City. Built to ease connections to old Yerevan. Renamed in honor of Armenian Rhomahan and co-mayor of Alania.


=== Tbilisi Line ===
=== Tbilisi Line ===
Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea.
Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea. Allows easy access to the Industrial area by the sea.


=== Castle Line ===
=== Castle Line ===
Third Line built, runs from the Grand Terminal underneath the Eastern sections of Alania and continues to the Alanian Castle.
Third Line built, runs from the Grand Terminal underneath the Eastern sections of Alania and continues to the Alanian Castle and the Southern Pass. Plans for southward expansion exist but are on hold.


=== Mountain Line ===
=== Mountain Line ===
Last line built, runs from the Grand Terminal northwards to an Alanian outpost just north of Alania. [[Category:Buisness]]
Last line built, runs from the Grand Terminal northwards to an Alanian outpost just north of Alania. Plans for future expansion north and east of the Caucasus also.
[[Category:Businesses (Classic)]]

Latest revision as of 16:45, 28 October 2023


History

Founded on 27/01/2018 to build and run the Metro rail system under Alania. The system is fully functional and used by town members extensively as a quick way to get around the town.

Lines

Armenian Line (Rhomahan Line)

First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and then with the Western Armenian City. Built to ease connections to old Yerevan. Renamed in honor of Armenian Rhomahan and co-mayor of Alania.

Tbilisi Line

Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea. Allows easy access to the Industrial area by the sea.

Castle Line

Third Line built, runs from the Grand Terminal underneath the Eastern sections of Alania and continues to the Alanian Castle and the Southern Pass. Plans for southward expansion exist but are on hold.

Mountain Line

Last line built, runs from the Grand Terminal northwards to an Alanian outpost just north of Alania. Plans for future expansion north and east of the Caucasus also.