Nostra:Trans-Tasman link: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
|title1=Trans-Tasman Link | |title1=Trans-Tasman Link | ||
|color=#e9f60f | |color=#e9f60f | ||
|logo = [[File:TTL shield.png|75px|border|link=]] | |||
|image1= [[File:New Zealand TTL Map.png|260px]] | |||
|type=Oceanic | |type=Oceanic | ||
|completion_date=27 June 2026 | |completion_date=27 June 2026 | ||
| Line 24: | Line 26: | ||
== Route == | == Route == | ||
[[File:trans-tasman-link-ad.png|thumb|Kiwi poster advertising the line.]] | [[File:trans-tasman-link-ad.png|thumb|left|Kiwi poster advertising the line.]] | ||
The route begins at Whitewater West Junction, North Island, [[Nostra:New Zealand|New Zealand]], where it connects to the [[Nostra:North–South Main Line|North–South Main]] and [[Nostra:Napier Line|Napier]] lines. Thence, it runs westbound via a southward chicane, reaching the town of [[Nostra:New Plymouth|New Plymouth]], New Zealand, after 410 metres. Immediately west of New Plymouth, an elevator brings the line down from y-level 7 to the oceanic level −62, whereafter it continues due west for around 8 kilometres. From kilometre 8,151 onward, where a small service station has been constructed, the iceway is maintained by [[Nostra:Australia|Australia]]. 127 metres west of the boundary, the line makes a 45° turn to the right and continues diagonally to the northeast until kilometre 9. There, it makes another 45° right turn to the north, reaching [[Nostra:South Coast|South Coast]], Australia, where it connects to other Australian iceway lines. | The route begins at Whitewater West Junction, North Island, [[Nostra:New Zealand|New Zealand]], where it connects to the [[Nostra:North–South Main Line|North–South Main]] and [[Nostra:Napier Line|Napier]] lines. Thence, it runs westbound via a southward chicane, reaching the town of [[Nostra:New Plymouth|New Plymouth]], New Zealand, after 410 metres. Immediately west of New Plymouth, an elevator brings the line down from y-level 7 to the oceanic level −62, whereafter it continues due west for around 8 kilometres. From kilometre 8,151 onward, where a small service station has been constructed, the iceway is maintained by [[Nostra:Australia|Australia]]. 127 metres west of the boundary, the line makes a 45° turn to the right and continues diagonally to the northeast until kilometre 9. There, it makes another 45° right turn to the north, reaching [[Nostra:South Coast|South Coast]], Australia, where it connects to other Australian iceway lines. | ||
| Line 32: | Line 34: | ||
! Town !! km !! Station !! Connection | ! Town !! km !! Station !! Connection | ||
|- | |- | ||
| | | rowspan="5" | ''Wilderness'' || 0,000 || [[File:NZ-Flag.png|25px]] ⟨1⟩ Whitewater West Junction || {{NzIcewayInline|NZML}}, {{NzIcewayInline|NL}} | ||
|- | |- | ||
| 0,411 || [[File:NZ-Flag.png|25px]] '''[[Nostra:New Plymouth|New Plymouth]] International''' <small>(Plm)</small> || | |||
|- | |- | ||
| 0,423 || ''Elevator'' — ⬆+7⬆ • ⬇−62⬇ || | |||
|- | |- | ||
| rowspan="2" | 8,151 || [[File:NZ-Flag.png|25px]] [[File:AustFlagNostra.png|25px]] Border Checkpoint || | |||
|- | |- | ||
| ''Maintainer Boundary'' — ⬆[[Nostra:New Zealand Ministry of Infrastructure|NMOI]]⬆ • ⬇[[Nostra:Opal Iceways|Opal Iceways]]⬇ || | | ''Maintainer Boundary'' — ⬆[[Nostra:New Zealand Ministry of Infrastructure|NMOI]]⬆ • ⬇[[Nostra:Opal Iceways|Opal Iceways]]⬇ || | ||
| Line 48: | Line 50: | ||
== Construction == | == Construction == | ||
[[File:nz-moi-gazette3.jpg|thumb|Issue No. 3 of the Official Gazette of the [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] announcing the construction of the line.]] | [[File:nz-moi-gazette3.jpg|thumb|left|Issue No. 3 of the Official Gazette of the [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] announcing the construction of the line.]] | ||
The two mining crews from [[Nostra:New Zealand|New Zealand]] and [[Nostra:Australia|Australia]], respectively, made their breakthrough at kilometre 7,662 on 27 June 2026. | The two mining crews from [[Nostra:New Zealand|New Zealand]] and [[Nostra:Australia|Australia]], respectively, made their breakthrough at kilometre 7,662 on 27 June 2026. | ||