Nostra:Highway 1 (New Zealand): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 19: | Line 19: | ||
'''Highway 1''' is an ice highway in [[Nostra:New Zealand|New Zealand]]. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, [[Nostra:NZ (Town)|NZ City]] and [[Nostra:Napier|Napier]], with each other. | '''Highway 1''' is an ice highway in [[Nostra:New Zealand|New Zealand]]. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, [[Nostra:NZ (Town)|NZ City]] and [[Nostra:Napier|Napier]], with each other. | ||
Its south end connects to the [[Nostra:World Border line|World Border line]], while its north end connects to the [[Nostra:North–South Main line|North–South Main line]], which eventually reaches Napier and the [https://en.wikipedia.org/wiki/North_Island North Island]. | Its south end connects to the [[Nostra:World Border line|World Border line]], while its north end connects to the [[Nostra:North–South Main line (New Zealand)|North–South Main line]], which eventually reaches Napier and the [https://en.wikipedia.org/wiki/North_Island North Island]. | ||
== Overview == | == Overview == | ||
| Line 27: | Line 27: | ||
! Town !! km !! Station !! Connection | ! Town !! km !! Station !! Connection | ||
|- | |- | ||
! colspan="4" | ''Merged with [[Nostra:North–South Main line|NZML]]'' ⬇ | ! colspan="4" | ''Merged with [[Nostra:North–South Main line (New Zealand)|NZML]]'' ⬇ | ||
|- | |- | ||
| [[Nostra:NZ (Town)|NZ City]] || 5,590 || '''NZ City North''' <small>(Nzn)</small> || {{NzIcewayInline|WB}} | | [[Nostra:NZ (Town)|NZ City]] || 5,590 || '''NZ City North''' <small>(Nzn)</small> || {{NzIcewayInline|WB}} | ||
| Line 48: | Line 48: | ||
== History == | == History == | ||
The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began in late June and the line was opened on 16th of August 2026. The floor height of the tunnel is an impressive 5 blocks (6 counting the ice layer), and the majority of the road has illumination. While it was initially built as 2 blocks wide, | The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began in late June and the line was opened on 16th of August 2026. The floor height of the tunnel is an impressive 5 blocks (6 counting the ice layer), and the majority of the road has illumination. While it was initially built as 2 blocks wide, the highway has been widened to 5 blocks on 1st of September, 2026. | ||
== Future == | == Future == | ||
An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the | An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the making as of 4th of September, 2026. <p> <p> | ||
''Last updated | ''Last updated September 4th, 2026'' | ||
{{NZ Iceways}} | {{NZ Iceways}} | ||