Nostra:Highway 1 (New Zealand): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 48: | Line 48: | ||
== History == | == History == | ||
The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began in late June and the line was opened on 16th of August 2026. The floor height of the tunnel is an impressive 5 blocks (6 counting the ice layer), and the majority of the road has illumination. While it was initially built as 2 blocks wide, | The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began in late June and the line was opened on 16th of August 2026. The floor height of the tunnel is an impressive 5 blocks (6 counting the ice layer), and the majority of the road has illumination. While it was initially built as 2 blocks wide, the highway has been widened to 5 blocks on 1st of September, 2026. | ||
== Future == | == Future == | ||
An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the | An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the making as of 4th of September, 2026. <p> <p> | ||
''Last updated | ''Last updated September 4th, 2026'' | ||
{{NZ Iceways}} | {{NZ Iceways}} | ||