Nova:Mossow-Neverwinter Iceway: Difference between revisions
Jump to navigation
Jump to search
>Wediaklup No edit summary |
mNo edit summary |
||
| (3 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
{{Iceway|type=International|completion_date=27th January 2020– <br>23rd February 2021|builders=[[NoSkinForLife]] | {{Iceway|type=International|completion_date=27th January 2020– <br>23rd February 2021|builders=[[NoSkinForLife]] | ||
[[File:Diamant.png|20px]] [[DiamantAxt9494]]|patroller=[[File:Diamant.png|20px]] [[DiamantAxt9494]]|total_distance=ca. 4100 blocks|stations=8|nations={{KAPSKFlag}} [[KAPSK]] | [[File:Diamant.png|20px]] [[DiamantAxt9494]]|patroller=[[File:Diamant.png|20px]] [[DiamantAxt9494]]|total_distance=ca. 4100 blocks|stations=8|nations={{KAPSKFlag}} [[KAPSK]]<br />[[A.A.T]] <small>(past)</small><br />[[Valkyrie]] <small>(past)</small>|continent=Antarctica|level=Tunnel; Bridge|row12={{Template:Nova:Mossow-Neverwinter Iceway Route}} | ||
[[A.A.T]] <small>(past)</small> | |image1=[[File:MossowNeverwinterThumbnail.png|380px]]|caption1=Ice road near Mossow (before renovation)}} | ||
[[Valkyrie]] <small>(past)</small>|continent=Antarctica|level=Tunnel; Bridge|row12={{ | |||
The '''Mossow – Neverwinter Iceway''' is a route composed of two individual ice roads. The first section was completed on 27 January 2020 and the whole Iceway finished on 23rd February 2021. It leads from [[Mossow]], where it goes through the Mossow Iceway tunnel, via [[Shrek]] to [[Neverwinter]]. | The '''Mossow – Neverwinter Iceway''' is a route composed of two individual ice roads. The first section was completed on 27 January 2020 and the whole Iceway finished on 23rd February 2021. It leads from [[Mossow]], where it goes through the Mossow Iceway tunnel, via [[Shrek]] to [[Neverwinter]]. | ||
| Line 84: | Line 17: | ||
====[[Shrek]] – [[Neverwinter]]==== | ====[[Shrek]] – [[Neverwinter]]==== | ||
The construction of the Shrek – Neverwinter section is not documented, however its assumed that it was completed in December of 2019. | The construction of the Shrek – Neverwinter section is not documented, however its assumed that it was completed in December of 2019. | ||
[[Category:Infrastructure]] | [[Category:Infrastructure]] | ||
[[Category:Iceways (Nova)]] | |||
[[Category:Antarctica]] | [[Category:Antarctica]] | ||
[[Category:KAPSK]] | [[Category:KAPSK]] | ||
[[Category:Casey]] | [[Category:Casey]] | ||
[[Category:Volksbundesbahnen]] | [[Category:Volksbundesbahnen]] | ||