Nova:Transcontinental Ice Rail (TCIR): Difference between revisions
>Evanhou No edit summary |
mNo edit summary |
||
| (50 intermediate revisions by 4 users not shown) | |||
| Line 2: | Line 2: | ||
Mongolia Section : 16.Aug.2019 | Mongolia Section : 16.Aug.2019 | ||
Siberia Section : 09.Feb.2020 | Siberia Section : 09.Feb.2020 | ||
Other sections are still working in progress.|Builder(s) = evanhou, XxSlayerMCxX, m51vortice, TR1NITY, Zhengjc , lei_she, landy_zhirui|Patroller = evanhou, XxSlayerMCxX|Departure Station = James Shoal(Hong_Kong)-Macau (Han) - Red-Moscow (Russian_Empire)|color = #004EA6}} | Other sections are still working in progress.|Builder(s) = evanhou, XxSlayerMCxX, m51vortice, TR1NITY, Zhengjc , lei_she, landy_zhirui|Patroller = evanhou, XxSlayerMCxX|Departure Station = James Shoal(Hong_Kong)-Macau (Han) - Red-Moscow (Russian_Empire) - Warsaw (Austria)|color = #004EA6}} | ||
'''The Transcontinental Ice Rail''' ('''TCIR''') is a ice rail | '''The Transcontinental Ice Rail''' ('''TCIR''') (Trans-Siberia Ice Road) is a ice rail system connecting | ||
continents on EMC in the overworld. With the length of approximately | continents on EMC in the overworld. With the length of approximately | ||
26 kilometer, from Borneo to Warsaw([[Austria]]). | |||
It provide high speed and time saving transportation between Asia and | It provide high speed and time saving transportation between Asia and | ||
Europe without teleportation. It’s the longest ice rail on the | Europe without teleportation. It’s the longest ice rail on the | ||
entire server, and now it’s | entire server, and now it’s planning to go further to the US | ||
and [[Australia]]. | and [[Australia]]. And it has also became a new way for mayors to search for new players in these days. | ||
The project is launched by the Taiwanese gamer [[evanhou]],which now living in [[Changsha]] ([[Han]]). Though most of the construction is done by evanhou, there's also a bunch of people around the world also made their construction in their hometown. [[XxSlayerMCxX]] is one of the main builder, the mod that deal with those grief along the route, and also the mayor of Changsha. The founder – [[evanhou]] said “When the teleport is down, JUST TAKE THE ICE RAIL!!!” | |||
== Status == | |||
The service is now back. With the population of of the passenger rise, the ice rail is now griefed hardly. The China section has been patrolled by The Chinese Ice Rail Community. But due to evanhou's school work irl and the amount of grief that reported to mods is too big, the maintenance of the Siberia section will be suspended until the mods fixed a single lane. | |||
== Design == | == Design == | ||
[[File:TCIR logo big.png|thumb|235x235px|TCIR Logo|none]] | [[File:TCIR logo big.png|thumb|235x235px|TCIR Logo|none]] | ||
== | == Time Line == | ||
08.Jul.2019 evanhou started the construction | |||
11.Jul.2019 First section of the ice rail is completed (From [[Changsha]] to [[Qin|XianYang]]) | |||
16.Aug.2019 The China-Mongolia section is done. | 16.Aug.2019 The China-Mongolia section is done. | ||
28.Aug.2019 The Siberia second was “temporary” done (1 lane only) and reached Ponsacco St. | |||
17.Oct.2019 evanhou officially start it's Ice rail shop business at Changsha and Ponsacco. | 17.Oct.2019 evanhou officially start it's Ice rail shop business at Changsha and Ponsacco. | ||
09.Feb.2020 The Siberia section is | 09.Feb.2020 The Siberia section is entirely completed. First stage of the construction complete. | ||
15.Jul.2020 EVERGREEN was founded by evanhou, and the Ice rail became a part of the company. | 15.Jul.2020 EVERGREEN was founded by evanhou, and the Ice rail became a part of the company. | ||
| Line 29: | Line 36: | ||
02.Sep.2020 evanhou made a announcement that EVERGREEN and Eva Air will stopped it's service till the Turmoil Era of the server is over. | 02.Sep.2020 evanhou made a announcement that EVERGREEN and Eva Air will stopped it's service till the Turmoil Era of the server is over. | ||
28.Mar.2021 The server updated to 1.16 and the render distance became further, which means we're finally able to travel on the ice rail at full speed again. | |||
18.May.2021 evanhou made a discord of the TCIR group, and decide to make plan for the further route. | |||
11.Jul.2021 The construction of the TCIR Headquarter completed it's now complete. | |||
19.Nov.2021 The Austria underground section is now abandoned due to the collapse of PLC. | |||
== Construction == | == Construction == | ||
| Line 35: | Line 48: | ||
=== '''Start of the construction''' === | === '''Start of the construction''' === | ||
TCIR started its construction on 8.July.2019 ( | TCIR started its construction on 8.July.2019 (2 days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). After 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (The day before [[Qin]] disband), connecting [[Changsha]] and [[Qin|XianYang]] (1.2 kilometer). | ||
[[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]] | [[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]] | ||
| Line 43: | Line 56: | ||
=== '''Siberia section''' === | === '''Siberia section''' === | ||
The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]] and started its construction right away. Took only 2 days (30 hours of work) the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server. | The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]] and started its construction right away. Took only 2 days (30 hours of work), the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server. | ||
[[File:2019-08-26 23.26.09.png|thumb|220x220px|Ice Rail route going through the Mongolia desert]] | [[File:2019-08-26 23.26.09.png|thumb|220x220px|Ice Rail route going through the Mongolia desert]] | ||
The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. | The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. | ||
| Line 55: | Line 68: | ||
=== '''China Section Improvement''' === | === '''China Section Improvement''' === | ||
Since the server became laggy, Ice rail became useless. But many people still using it to travel between towns. To decrease the danger and improve the experience, evanhou decided to improve the entire section by filling all the gap between ices in the tunnels and add smooth stone slab to the side of the lane. The construction start from 12.Jul.2020 and it's planned to improve the section from Macau to Northern Mongolia. | [[File:2020-02-15 00.53.48.png|thumb|Changsha outer station|223x223px]] | ||
Since the server became laggy, Ice rail became useless. But many people still using it to travel between towns. To decrease the danger that cause by the server lag and improve the experience, evanhou decided to improve the entire section by filling all the gap between ices in the tunnels and add smooth stone slab to the side of the lane. The construction start from 12.Jul.2020 and it's planned to improve the section from Macau to Northern Mongolia. | |||
=== '''Future plan''' === | === '''Future plan''' === | ||
| Line 61: | Line 75: | ||
Now further planning is working in progress. Second stage of construction planned to reach [[Australia]] and the third stage of construction planned to reach the [[North America]]. Second stage of construction will soon be launch once the server is back on a stable condition. | Now further planning is working in progress. Second stage of construction planned to reach [[Australia]] and the third stage of construction planned to reach the [[North America]]. Second stage of construction will soon be launch once the server is back on a stable condition. | ||
== | == Route Maps == | ||
[[File:TCIR map 1st Edtion (fixed).png | [[File:TCIR map 1st Edtion (fixed).png|thumb|749x749px|'''Map of Transcontinental Ice Rail'''|alt=|left]] | ||
[[File: | [[File:Iceroad of Eastern Hemisphere.jpg|thumb|749x749px|'''Ice Rail project of Eastern Hemisphere''' (Made by Remcodd)|alt=|none]] | ||
'''Stations/Locations | == '''Stations/Locations Chart:(Needed to be updated)''' == | ||
{| class=" | {| class="wikitable" | ||
!Station | !Station | ||
!Location | !Location | ||
| Line 391: | Line 405: | ||
== Difficulties == | == Difficulties == | ||
=== '''China Section (08.Jul.2019~16.Aug.2019)''' === | |||
==== '''In China and Mongolia''' ==== | |||
The construction started from 08.Jul.2019, when the [[Chinese Civil War]] is still going on. evanhou got killed more than 10 times by [[Gang of four]] ([[Bommbap]] , [[Cobetkhei]] , [[YobetChel]] , [[Ylome]]) and a lot of building material and god tools was lost after dead, which slows down the construction significantly. Some days when the war went viral, there won't even be a chance to get out the of the claimed area safely. At that time works are only been done while they're offline. | |||
Killers not only came from the Gang of four, but also those from the western nation. The construction also hasten the sniper to come to the latest construction site. With nearly full armor on evanhou, he still got killed several times due to the lack of reaction time and the invis effect that sniper used. Afterward, evanhou decided not to have full armor on during construction. | |||
'''In Antarctica''' | |||
At first, the ice mining is been conducted at the ice farm near /n spawn Antarctica. Unfortunately a lot of ppl likes to hunt down ppl in the ice fram, evanhou got killed once and almost got killed for several times. After that, evanhou started to search for a new spot for ice mining. And finally found a island that's suitable to farm ice near [[Kingdom of Ellsworth|Ellsworth]]. Because the island doesn't actually existed irl, evanhou named the island [[White Island]] and left it unclaimed till now. Fun Fact : Most of the ice that support the entire construction of the China Section and Sibeira Section came from [[White Island]]. | |||
=== '''Siberia Section (27.Aug.2019~09.Feb.2020)''' === | |||
<br /> | |||
[[Category:Unique Page]] | [[Category:Unique Page]] | ||
[[Category:Architecture]] | [[Category:Architecture]] | ||
[[Category:Infrastructure]] | [[Category:Infrastructure]] | ||
[[Category:Iceways (Nova)]] | |||