Classic:Alania Metro: Difference between revisions

From EarthMC
Jump to navigation Jump to search
Line 10: Line 10:


=== Tbilisi Line ===
=== Tbilisi Line ===
Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea.[[Category:Buisness]]
Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea.
 
=== Castle Line ===
 
=== Mountain Line ===
[[Category:Buisness]]

Revision as of 14:29, 13 March 2018


History

Founded on 27/01/2018 to build and run the Metro rail system under Alania

Lines

Armenian Line

First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and then with the Western Armenian City.

Tbilisi Line

Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea.

Castle Line

Mountain Line