Nova:Transcontinental Ice Rail (TCIR): Difference between revisions

>Evanhou
>Evanhou
Line 16: Line 16:


The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. In December, the construction was nearly stopped due to evanhou’s college entrance exam. But thanks to Slayer, the pillars and another lane of the ice rail was able to keep on going for 3 kilometers. And the rest of the part is later been completed by evanhou. On 9.Feb.2020 The Transcontinental Ice Rail Asia-Eastern Europe Section was finally fully completed, and the whole server receive the following message “After nearly half year of hard work The Transcontinential Ice Rail Asia—Eastern Europe section (start from Changsha(Han) to Ponsacco(Tzarist_Russia))is finally complete. The trip is nearly 20km and takes less than 10mins GG!!!” 
The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. In December, the construction was nearly stopped due to evanhou’s college entrance exam. But thanks to Slayer, the pillars and another lane of the ice rail was able to keep on going for 3 kilometers. And the rest of the part is later been completed by evanhou. On 9.Feb.2020 The Transcontinental Ice Rail Asia-Eastern Europe Section was finally fully completed, and the whole server receive the following message “After nearly half year of hard work The Transcontinential Ice Rail Asia—Eastern Europe section (start from Changsha(Han) to Ponsacco(Tzarist_Russia))is finally complete. The trip is nearly 20km and takes less than 10mins GG!!!” 
Now further planning is working in progress. Second stage of construction planned to reach Australia and the third stage of construction planned to reach the US. Both section will be in progress at the same time.