TCIR started its construction on 8.July.2019 (two days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (3 days before [[Qin]] disband), connecting [[Changsha]] and [[XianYang]] (1.2 kilometer) . After [[Qin]] disband, [[Han]] took over China, the Mongolia section and Macau section was permitted by [[Shia_Chan]] (Empress). Soon after, the Mongolia section was completed and the Macau section was put in hold due to Macau mayor’s opinion. The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]]  and started its construction right away. Took only 2 days (30 hours of work) the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server.
[[File:2019-07-11 17.10.23.png|thumb|218x218px|Xianyang tunnel 1 during construction]]
 
TCIR started its construction on 8.July.2019 (two days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (3 days before [[Qin]] disband), connecting [[Changsha]] and [[XianYang]] (1.2 kilometer).  
The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. In December, the construction was nearly stopped due to evanhou’s college entrance exam. But thanks to Slayer, the pillars and another lane of the ice rail was able to keep on going for 3 kilometers. And the rest of the part is later been completed by evanhou. On 9.Feb.2020 The Transcontinental Ice Rail Asia-Eastern Europe Section was finally fully completed, and the whole server receive the following message “After nearly half year of hard work The Transcontinential Ice Rail Asia—Eastern Europe section (start from Changsha(Han) to Ponsacco(Tzarist_Russia))is finally complete. The trip is nearly 20km and takes less than 10mins GG!!!” 
[[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]]
 
After [[Qin]] disband, [[Han]] took over China, the Mongolia section and Macau section was permitted by [[Shia_Chan]] (Empress). Soon after, the Mongolia section was completed and the Macau section was put in hold due to Macau mayor’s opinion. The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]]  and started its construction right away. Took only 2 days (30 hours of work) the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server.
[[File:2019-08-26 23.26.09.png|thumb|220x220px|Ice Rail route going through the Mongolia desert]]
The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. 
[[File:2019-09-20 02.00.06.png|thumb|220x220px|Patrolling the ice rail in the Siberian forest during snow]]
In December, the construction was nearly stopped due to evanhou’s college entrance exam. But thanks to Slayer, the pillars and another lane of the ice rail was able to keep on going for 3 kilometers. And the rest of the part is later been completed by evanhou. On 9.Feb.2020 The Transcontinental Ice Rail Asia-Eastern Europe Section was finally fully completed, and the whole server receive the following message “After nearly half year of hard work The Transcontinential Ice Rail Asia—Eastern Europe section (start from Changsha(Han) to Ponsacco(Tzarist_Russia))is finally complete. The trip is nearly 20km and takes less than 10mins GG!!!” 
[[File:2019-11-02 20.54.59.png|thumb|220x220px|People from all around the world left a sign at the descending station]]
Now further planning is working in progress. Second stage of construction planned to reach [[Australia]] and the third stage of construction planned to reach the [[North America]]. Both section will be in progress at the same time. 