Nova:Transcontinental Ice Rail (TCIR): Difference between revisions

>Bobberson
Adding categories
>Evanhou
Line 1: Line 1:
{{EnhancedIcerail|title1 = Transcontinental Ice Rail (TCIR)|image1 = [[File:TCIR logo big.png|300px]]|image2 = [[File:TCIR map 1st Edtion (fixed).png|300px]]|eras = {{Eras|Flooding|Crowded|Stabilization|Turmoil}}|Type = Transcontinental (International)|Completion Date = China Section : 18.Jul.2019
{{EnhancedIcerail|title1 = Transcontinental Ice Rail (TCIR)|image1 = [[File:TCIR logo big.png|300px]]|image2 = [[File:TCIR map 1st Edtion (fixed).png|300px]]|eras = {{Eras|Flooding|Crowded|Stabilization|Turmoil}}|Type = Transcontinental (International)|Completion Date = China Section : 11.Jul.2019
Mongolia Section : 16.Aug.2019
Siberia Section : 09.Feb.2020
Siberia Section : 09.Feb.2020
Other sections are still working in progress.|Builder(s) = evanhou, XxSlayerMCxX, m51vortice, TR1NITY, Zhengjc , lei_she|Patroller = evanhou, XxSlayerMCxX|Departure Station = Macau (Han) - Red-Moscow (Tzarist_Russia)|color = #004EA6}}
Other sections are still working in progress.|Builder(s) = evanhou, XxSlayerMCxX, m51vortice, TR1NITY, Zhengjc , lei_she|Patroller = evanhou, XxSlayerMCxX|Departure Station = Macau (Han) - Red-Moscow (Tzarist_Russia)|color = #004EA6}}
Line 19: Line 20:
== Construction ==
== Construction ==
[[File:2019-07-11 17.10.23.png|thumb|218x218px|Xianyang tunnel 1 during construction]]
[[File:2019-07-11 17.10.23.png|thumb|218x218px|Xianyang tunnel 1 during construction]]
=== '''Start of the construction''' ===
TCIR started its construction on 8.July.2019 (two days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (The day before [[Qin]] disband), connecting [[Changsha]] and [[XianYang]] (1.2 kilometer).  
TCIR started its construction on 8.July.2019 (two days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (The day before [[Qin]] disband), connecting [[Changsha]] and [[XianYang]] (1.2 kilometer).  
[[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]][[File:2020-03-03 18.50.03.png|thumb|220x220px|Flag Of Transcontinental Ice Rail in Ponsacco sponsor shop]]
[[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]]
After [[Qin]] disband, [[Han]] took over China, the Mongolia section and Macau section was permitted by [[Shia_Chan]] (Empress). Soon after, the Mongolia section was completed and the Macau section was put in hold due to Macau mayor’s opinion. The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]]  and started its construction right away. Took only 2 days (30 hours of work) the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server.
 
=== '''Mongolia section and Macau Section''' ===
[[File:2020-03-03 18.50.03.png|thumb|220x220px|Flag Of Transcontinental Ice Rail in Ponsacco sponsor shop]]
After [[Qin]] disband, [[Han]] took over China, the Mongolia section and Macau section was permitted by [[Shia_Chan]] (Empress). Soon after, the Mongolia section was completed and the Macau section was put in hold due to Macau mayor’s opinion.  
 
=== '''Siberia section''' ===
The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]]  and started its construction right away. Took only 2 days (30 hours of work) the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server.
[[File:2019-08-26 23.26.09.png|thumb|220x220px|Ice Rail route going through the Mongolia desert]]
[[File:2019-08-26 23.26.09.png|thumb|220x220px|Ice Rail route going through the Mongolia desert]]
The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. 
The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. 
[[File:2019-09-20 02.00.06.png|thumb|220x220px|Patrolling the ice rail in the Siberian forest during snow]]
[[File:2019-09-20 02.00.06.png|thumb|220x220px|Patrolling the ice rail in the Siberian forest during snow]]
In December, the construction was nearly stopped due to evanhou’s college entrance exam. But thanks to Slayer, the pillars and another lane of the ice rail was able to keep on going for 3 kilometers. And the rest of the part is later been completed by evanhou. On 9.Feb.2020 The Transcontinental Ice Rail Asia-Eastern Europe Section was finally fully completed, and the whole server receive the following message “After nearly half year of hard work The Transcontinential Ice Rail Asia—Eastern Europe section (start from Changsha(Han) to Ponsacco(Tzarist_Russia))is finally complete. The trip is nearly 20km and takes less than 10mins GG!!!” 
In December, the construction was nearly stopped due to evanhou’s college entrance exam. But thanks to Slayer, the pillars and another lane of the ice rail was able to keep on going for 3 kilometers. And the rest of the part is later been completed by evanhou. On 9.Feb.2020 The Transcontinental Ice Rail Asia-Eastern Europe Section was finally fully completed, and the whole server receive the following message “After nearly half year of hard work The Transcontinential Ice Rail Asia—Eastern Europe section (start from Changsha(Han) to Ponsacco(Tzarist_Russia))is finally complete. The trip is nearly 20km and takes less than 10mins GG!!!” 
=== '''South China Sea section''' ===
The construction of South China Sea section is already permitted. But the construction was put into hold again cuz evanhou is busy working on the Changsha subway. The server is also being laggy and make the ice rail became useless, make it seems unnecessary to continue any construction.
=== '''Future plan''' ===
[[File:2019-11-02 20.54.59.png|thumb|220x220px|People from all around the world left a sign at the descending station]]
[[File:2019-11-02 20.54.59.png|thumb|220x220px|People from all around the world left a sign at the descending station]]
Now further planning is working in progress. Second stage of construction planned to reach [[Australia]] and the third stage of construction planned to reach the [[North America]]. Both section will be in progress at the same time. 
Now further planning is working in progress. Second stage of construction planned to reach [[Australia]] and the third stage of construction planned to reach the [[North America]]. Both section will be in progress at the same time.