Nostra:Holy Land: Difference between revisions
Jump to navigation
Jump to search
quarox.777 (talk | contribs) |
quarox.777 (talk | contribs) |
||
| Line 264: | Line 264: | ||
==== Construction and Consecration ==== | ==== Construction and Consecration ==== | ||
The construction of the Church was finished in January 2024. It was consecrated on the | [[File:Consecration 1.png|thumb|179x179px|''Consecration on the 10th March 2024'']] | ||
The construction of the Church was finished in January 2024. It was consecrated on the 10th March of 2024 in the name of [[wikipedia:Queen_of_Heaven|Our Lady, Queen of Heaven]]. | |||
==== Gallery ==== | ==== Gallery ==== | ||
| Line 293: | Line 294: | ||
==== Construction and Consecration ==== | ==== Construction and Consecration ==== | ||
[[File:-.png|thumb|188x188px|''Consecration on 4th June of 2023.'']]The construction of the Church was finished on the 15th May of 2023. It was consecrated on the 4th June of 2023 to the [[Holy Family]]. | [[File:-.png|thumb|188x188px|''Consecration on 4th June of 2023.'']]The original model for the construction of the Holy Family Church was the [[wikipedia:Church_of_the_Flagellation|Church of the Flagellation]] (Jerusalem, Israel). The construction of the Church was finished on the 15th May of 2023. It was consecrated on the 4th June of 2023 to the [[Holy Family]]. | ||
==== Gallery ==== | ==== Gallery ==== | ||