Nostra:Highway 1 (New Zealand): Difference between revisions
masterewild (talk | contribs) mNo edit summary |
No edit summary |
||
| Line 51: | Line 51: | ||
== Future == | == Future == | ||
An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the design phase as of | An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the design phase as of 23rd of August, 2026. <p> <p> | ||
''Last updated August | ''Last updated August 23nd, 2026'' | ||
{{NZ Iceways}} | {{NZ Iceways}} | ||
| Line 59: | Line 59: | ||
[[Category:Ice Highways (Nostra)]] | [[Category:Ice Highways (Nostra)]] | ||
[[Category:Good article]] | [[Category:Good article]] | ||
[[Category:New Zealand (Nostra)]] | |||