JERealize: Difference between revisions

>JERealize
No edit summary
>JERealize
No edit summary
Line 25: Line 25:
On May 14, the South Australian Highway connected to "Port Lincoln". On May 18, the highway, now branded as the Australian National Highway, connected to Perth, and a bypass was being built.
On May 14, the South Australian Highway connected to "Port Lincoln". On May 18, the highway, now branded as the Australian National Highway, connected to Perth, and a bypass was being built.


On May 23, the bypass was finished. The next day, a bridge revival program was implemented to rebuild the bridge connecting Australia to Sorong just enough for Darwin to be connected to the East Indian Bypass (the bridge being built around Sorong).
On May 23, the bypass was finished. The next day, a bridge revival program was implemented to rebuild the bridge connecting Australia to Sorong just enough for Darwin to be connected to the East Indian Bypass (the bridge being built around Sorong). That bridge was finished on May 25.


==Current Rankings==
==Current Rankings==
Line 42: Line 42:
|-
|-
! scope="row"|Acrobatics
! scope="row"|Acrobatics
|#146
|#144
|
|
|
|
Line 69: Line 69:
|-
|-
! scope="row"|Axes
! scope="row"|Axes
|#52
|#49
|5/14/2018
|5/14/2018
|
|5/25/2018
|
|
|
|
Line 105: Line 105:
|-
|-
! scope="row"|Mining
! scope="row"|Mining
|#140
|#136
|
|
|
|