Aurora:AZ-18: Difference between revisions

dzik32#0 (talk | contribs)
dzik32#0 (talk | contribs)
Line 4: Line 4:
==The Building of [[The Citadel]]==
==The Building of [[The Citadel]]==


Plans for The Citadel started in early June 2023, almost instantly after the formation of AZ-18. It was meant to stretch from sea-level to the build limit, almost 200 blocks high. Official building of The Citadel started on the 8th of June, with original plans stating it would be made out of black and grey wool. However,
Plans for The Citadel started in early June 2023, almost instantly after the formation of AZ-18. It was meant to stretch from sea-level to the build limit, almost 200 blocks high. Official building of The Citadel started on the 8th of June, with original plans stating it would be made out of black and grey wool. However, the use of wool was scrapped after 1 day because of concerns with its price and flammability, therefore it was substituted with deepslate cobble and bricks.