Aurora:Arctic: Difference between revisions

No edit summary
Line 78: Line 78:


The draining process also took a while as a large volume was emptied due to the high ceilings of the new building. This building remains the capital building as of November 16th 2022, with both the n spawn and town spawn being located in the center of the building. The building also houses 6 shop plots in its right wing, leading to increased travel to the n spawn for shopping. A casino was also built near the n spawn by RJ_Ace, further increasing the popularity of the spawn.
The draining process also took a while as a large volume was emptied due to the high ceilings of the new building. This building remains the capital building as of November 16th 2022, with both the n spawn and town spawn being located in the center of the building. The building also houses 6 shop plots in its right wing, leading to increased travel to the n spawn for shopping. A casino was also built near the n spawn by RJ_Ace, further increasing the popularity of the spawn.
[[File:Arctic capital.png|thumb|left|Image of the current Arctic capital building, completed August 10th 2022.]]


==Notable People==
==Notable People==