Cascadian Capitol Building: Difference between revisions

brianguy (talk | contribs)
No edit summary
brianguy (talk | contribs)
No edit summary
Line 31: Line 31:


=== Early 2023 ===
=== Early 2023 ===
WIP
On March 10, 2023 a build contest opened for the capitol, applicants had to design a building that fit within a four by four chunk zone on the coast of Olympia. Two applicants submitted designs, Setrus proposed a design based on the real life United States Capitol and Washington State Capitol, notably it was intended to be built outside the intended zone instead being built in place of the uncompleted national museum where the building sits today. Cheeseballfluffy proposed a plan to rebuild a tweaked version of the Nova Cascadian capitol design. Setrus' design won the vote and construction started on April 15, 2023 after minor design changn changes.
 
The building was infamous for its heavy quartz usage, requiring a nationwide quartz drive and favored deals with Cascadian suppliers. Construction was done primarily by Setrus who then employed HibachiBeamz later on to help with the interior. On April 18, two days into the Presidency of [[AghastBlock]], the capitol was constructed and considered usable. Its first major use was on May 21 with the presidential inauguration of Setrus and subsequent firework shows.


=== Late Renovations ===
=== Late Renovations ===