Nostra:Highway 1 (New Zealand): Difference between revisions

From EarthMC
Jump to navigation Jump to search
wediaklup (talk | contribs)
No edit summary
No edit summary
Line 2: Line 2:
|title1=Highway 1
|title1=Highway 1
|color=#bd3031
|color=#bd3031
|logo = [[File:New Zealand Highway 1.png|75px|border]]
|logo = [[File:New Zealand Highway 1.png|75px|border|link=]]
|image1= [[File:New Zealand Highway 1 Map.png|250px]]
|image1= [[File:New Zealand Highway 1 Map.png|260px|link=]]
|caption1={{Color box|#FF0000}} Highway 1<br/>{{Color box|#F89C35}} [[Nostra:North–South Main Line|North–South Main Line]]<br/>{{Color box|#DC35A3}} Planned route
|type=Domestic
|type=Domestic
|completion_date=16 August 2026
|completion_date=16 August 2026
Line 14: Line 15:
|level=y = −62
|level=y = −62
|row12=
|row12=
|caption1=}}
}}
'''Highway 1''' is an ice highway in [[Nostra:New Zealand|New Zealand]]. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, [[Nostra:NZ (Town)|NZ City]] and [[Nostra:Napier|Napier]], with each other.
'''Highway 1''' is an ice highway in [[Nostra:New Zealand|New Zealand]]. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, [[Nostra:NZ (Town)|NZ City]] and [[Nostra:Napier|Napier]], with each other.


Line 29: Line 30:
| [[Nostra:NZ (Town)|NZ City]] || 5,590 || '''NZ City North''' <small>(Nzn)</small> || [[Nostra:World Border line|WB]]
| [[Nostra:NZ (Town)|NZ City]] || 5,590 || '''NZ City North''' <small>(Nzn)</small> || [[Nostra:World Border line|WB]]
|-
|-
| Townless || 5,112 || ⟨7⟩ Horsely West Junction || [[File:New Zealand Highway 1.png|20px|border]]
| Townless || 5,112 || ⟨7⟩ Horsely West Junction || [[File:New Zealand Highway 1.png|20px|border|link=]]
|-
|-
! colspan="4" | ''Highway 1'' ⬇
! colspan="4" | ''Highway 1'' ⬇
Line 44: Line 45:
== History ==
== History ==
The ice road was built by [[iUpgrade]] and [[wediaklup]].
The ice road was built by [[iUpgrade]] and [[wediaklup]].
== Planned routes ==
A route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be build as of 18th of August, 2026.


[[Category:Ice Highways (Nostra)]]
[[Category:Ice Highways (Nostra)]]

Revision as of 18:00, 18 August 2026

Highway 1

ㅤ Highway 1
ㅤ North–South Main Line
ㅤ Planned route
General Information
Type Domestic
Completion Date 16 August 2026
Builder(s) iUpgrade, wediaklup
Patroller(s) New Zealand Ministry of Infrastructure
Total Distance 3589 m
Stations
Geographical Information
Nation(s) New Zealand
Continent Oceania
Technical Information
Level y = −62
Width
Route Information

Highway 1 is an ice highway in New Zealand. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, NZ City and Napier, with each other.

Route

Highway 1 branches from the North–South Main Line at Zealandia Junction located beneath the Pacific Ocean roughly a kilometre east of Christchurch, and then runs southbound for 832 metres before turning to the West. It continues thence for 2279 metres before reaching Horsely West Junction, where it joins the North–South Main Line again. For the remaining 478 metres to NZ City North station, the North–South Main Line and Highway 1 are colocated.

⬇ NZ City to Zealandia Junction ⬇
Town km Station Connection
Merged with NZML ⬇
NZ City 5,590 NZ City North (Nzn) WB
Townless 5,112 ⟨7⟩ Horsely West Junction
Highway 1 ⬇
Townless 0,000 ⟨1⟩ Horsely West Junction NZML
3,111 ⟨2⟩ Zealandia Junction NZML
⬆ Zealandia Junction to NZ City ⬆
For the connexion to Napier, cf. North–South Main Line.

History

The ice road was built by iUpgrade and wediaklup.

Planned routes

A route to Christchurch has been planned but is yet to be build as of 18th of August, 2026.