Nostra:Highway 1 (New Zealand): Difference between revisions
mNo edit summary |
No edit summary |
||
| Line 44: | Line 44: | ||
== History == | == History == | ||
The ice road was built by [[iUpgrade]] and [[wediaklup]]. | The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began on late june and the line was opened on 16th of August 2026. The floor height of the tunnel is a impressive 5 blocks (6 counting ice layer) and majority of the road has illumination. While only 2 blocks wide, there have been plans to widen the road. | ||
== | == Future == | ||
A route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be build as of 18th of August, 2026. | A route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be build as of 18th of August, 2026. Map art signages are planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]]. | ||
[[Category:Ice Highways (Nostra)]] | [[Category:Ice Highways (Nostra)]] | ||
Revision as of 19:47, 22 August 2026
| ||||||||||||||||||||||||||||
Highway 1 is an ice highway in New Zealand. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, NZ City and Napier, with each other.
Route
Highway 1 branches from the North–South Main Line at Zealandia Junction located beneath the Pacific Ocean roughly a kilometre east of Christchurch, and then runs southbound for 832 metres before turning to the West. It continues thence for 2279 metres before reaching Horsely West Junction, where it joins the North–South Main Line again. For the remaining 478 metres to NZ City North station, the North–South Main Line and Highway 1 are colocated.
| ⬇ NZ City to Zealandia Junction ⬇ | |||
|---|---|---|---|
| Town | km | Station | Connection |
| Merged with NZML ⬇ | |||
| NZ City | 5,590 | NZ City North (Nzn) | WB |
| Townless | 5,112 | ⟨7⟩ Horsely West Junction | |
| Highway 1 ⬇ | |||
| Townless | 0,000 | ⟨1⟩ Horsely West Junction | NZML |
| 3,111 | ⟨2⟩ Zealandia Junction | NZML | |
| ⬆ Zealandia Junction to NZ City ⬆ | |||
| For the connexion to Napier, cf. North–South Main Line. | |||
History
The ice road was built by iUpgrade and wediaklup. Construction began on late june and the line was opened on 16th of August 2026. The floor height of the tunnel is a impressive 5 blocks (6 counting ice layer) and majority of the road has illumination. While only 2 blocks wide, there have been plans to widen the road.
Future
A route to Christchurch has been planned but is yet to be build as of 18th of August, 2026. Map art signages are planned by New Zealand Ministry of Infrastructure.