Nostra:Highway 1 (New Zealand): Difference between revisions
No edit summary |
No edit summary |
||
| Line 18: | Line 18: | ||
'''Highway 1''' is an ice highway in [[Nostra:New Zealand|New Zealand]]. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, [[Nostra:NZ (Town)|NZ City]] and [[Nostra:Napier|Napier]], with each other. | '''Highway 1''' is an ice highway in [[Nostra:New Zealand|New Zealand]]. It was first opened on 16th of August 2026 and connects the two capitals of New Zealand, [[Nostra:NZ (Town)|NZ City]] and [[Nostra:Napier|Napier]], with each other. | ||
Its south | Its south end connects to the [[Nostra:World Border line|World Border line]], while its north end connects to the [[Nostra:North–South Main Line|North–South Main Line]], which eventually reaches Napier and the [https://en.wikipedia.org/wiki/North_Island North Island]. | ||
== Overview == | == Overview == | ||
| Line 47: | Line 47: | ||
== History == | == History == | ||
The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began | The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began in late june and the line was opened on 16th of August 2026. The floor height of the tunnel is an impressive 5 blocks (6 counting the ice layer), and the majority of the road has illumination. While it is only 2 blocks wide, there have been plans to widen the road. | ||
== Future == | == Future == | ||
An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be | An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the design phase as of 18th of August, 2026. | ||
{{NZ Iceways}} | {{NZ Iceways}} | ||
[[Category:Ice Highways (Nostra)]] | [[Category:Ice Highways (Nostra)]] | ||