Nostra:Highway 1 (New Zealand): Difference between revisions
No edit summary |
No edit summary |
||
| Line 48: | Line 48: | ||
== History == | == History == | ||
The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began in late June and the line was opened on 16th of August 2026. The floor height of the tunnel is an impressive 5 blocks (6 counting the ice layer), and the majority of the road has illumination. While it | The ice road was built by [[iUpgrade]] and [[wediaklup]]. Construction began in late June and the line was opened on 16th of August 2026. The floor height of the tunnel is an impressive 5 blocks (6 counting the ice layer), and the majority of the road has illumination. While it was initially built as 2 blocks wide, there have been plans to widen the road. | ||
== Future == | == Future == | ||
An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the design phase as of 23rd of August, 2026. <p> <p> | An auxiliary route to [[Nostra:Christchurch|Christchurch]] has been planned but is yet to be built. Signage in form of map art is planned by [[Nostra:New Zealand Ministry of Infrastructure|New Zealand Ministry of Infrastructure]] and are in the design phase as of 23rd of August, 2026. <p> <p> | ||
''Last updated August | ''Last updated August 23rd, 2026'' | ||
{{NZ Iceways}} | {{NZ Iceways}} | ||