Nostra:Bratislava: Difference between revisions

libor9 (talk | contribs)
No edit summary
libor9 (talk | contribs)
No edit summary
Line 192: Line 192:


Libor2 flattens and terraforms 12 chunks in Nitra, to lay a foundation for the planned construction of the Bratislava castle.
Libor2 flattens and terraforms 12 chunks in Nitra, to lay a foundation for the planned construction of the Bratislava castle.
'''October 19th 2026'''
Expansion into New Nitra by Bratislava is finished, as Libor2 claims the final 9 chunks for the town.


== Local Council ==
== Local Council ==