Classic:Alania Metro: Difference between revisions

From EarthMC
Jump to navigation Jump to search
(Adding categories)
No edit summary
Line 3: Line 3:
== History ==
== History ==
Founded on 27/01/2018 to build and run the Metro rail system under Alania
Founded on 27/01/2018 to build and run the Metro rail system under Alania
[[Category:Buisness]]
 
== Lines ==
 
=== Armenian Line ===
First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and in the future with the Western Armenian City
 
=== Tbilisi Line ===
Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea[[Category:Buisness]]

Revision as of 23:50, 30 January 2018


History

Founded on 27/01/2018 to build and run the Metro rail system under Alania

Lines

Armenian Line

First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and in the future with the Western Armenian City

Tbilisi Line

Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea