Kongsvinger: Difference between revisions

>CrA6914
No edit summary
>CrA6914
No edit summary
Line 17: Line 17:
== Transportation ==
== Transportation ==


=== Matrand Tram ===
=== Matrand Metro ===
{{Picture|image1 = Mat hou.png|caption1 = The town hall of Matrand}}Still under construction, this system proposes to connect the railway station to other landmarks such as the Town centre and the bank. This line will loop around the town and hopefully benefit the economic growth as well. Phase 1 will be completed in the near future and will have three stops, connecting the railway station with the town centre and the bank. Phase 2 will connect the existing line to the church and phase 3 will complete the loop altogether.  
{{Picture|image1 = Mat hou.png|caption1 = The town hall of Matrand}}Still under construction, this system proposes to connect the railway station to other landmarks such as the Town centre and the bank. This line will loop around the town and hopefully benefit the economic growth as well. Phase 1 will be completed in the near future and will have three stops, connecting the railway station with the town centre and the bank. Phase 2 will connect the existing line to the church and phase 3 will complete the loop altogether.