JERealize: Difference between revisions
>JERealize No edit summary |
>JERealize No edit summary |
||
| Line 26: | Line 26: | ||
On May 23, the bypass was finished. The next day, a bridge revival program was implemented to rebuild the bridge connecting Australia to Sorong just enough for Darwin to be connected to the East Indian Bypass (the bridge being built around Sorong). That bridge was finished on May 25. | On May 23, the bypass was finished. The next day, a bridge revival program was implemented to rebuild the bridge connecting Australia to Sorong just enough for Darwin to be connected to the East Indian Bypass (the bridge being built around Sorong). That bridge was finished on May 25. | ||
On May 26, the highway from Perth connected to Karratha, and Coffeetom built a bypass around it. | |||
==Current Rankings== | ==Current Rankings== | ||
| Line 51: | Line 53: | ||
|- | |- | ||
! scope="row"|Alchemy | ! scope="row"|Alchemy | ||
|# | |#18 | ||
|Achieved | |Achieved | ||
|4/13/2018 | |4/13/2018 | ||
| | |5/27/2018 | ||
| | | | ||
| | | | ||
| Line 87: | Line 89: | ||
|- | |- | ||
! scope="row"|Fishing | ! scope="row"|Fishing | ||
|# | |#29 | ||
|Achieved | |Achieved | ||
|Achieved | |Achieved | ||
| Line 123: | Line 125: | ||
|- | |- | ||
! scope="row"|Swords | ! scope="row"|Swords | ||
|# | |#135 | ||
| | | | ||
| | | | ||
| Line 141: | Line 143: | ||
|- | |- | ||
! scope="row"|Unarmed | ! scope="row"|Unarmed | ||
|# | |#164 | ||
| | | | ||
| | | | ||
| Line 159: | Line 161: | ||
|- | |- | ||
! scope="row"|Total | ! scope="row"|Total | ||
|# | |#14 | ||
|4/20/2018 | |4/20/2018 | ||
|4/29/2018 | |4/29/2018 | ||