Tiger's Nest: Difference between revisions

>Barbay1
m →Growth of Tigers_Nest: Resized some pictures
>Barbay1
m Resized pictures to compact the page
Line 45: Line 45:
Because of the steep cliff, a platform was constructed to prevent bad accidents.(July 15, 2019)
Because of the steep cliff, a platform was constructed to prevent bad accidents.(July 15, 2019)


Building is in the framework and design phase. (July 22, 2019)[[File:2019-07-21_02.04.00.png|thumb|left|419x419px|Frame with platform]][[File:2019-07-21_02.04.23.png|thumb|361x361px|View from the Tigers Nest Cafeteria site]]
Building is in the framework and design phase. (July 22, 2019)[[File:2019-07-21_02.04.00.png|thumb|left|318x318px|Frame with platform]][[File:2019-07-21_02.04.23.png|thumb|299x299px|View from the Tigers Nest Cafeteria site]]




Line 54: Line 54:




[[File:2019-08-13 21.36.17 Front.png|thumb|381x381px|Started constructing the front. (Aug 13, 2019)|none]]
[[File:2019-08-13 21.36.17 Front.png|thumb|317x317px|Started constructing the front. (Aug 13, 2019)|none]]
[[File:2019-09-05 18.10.13-0.png|thumb|330x330px|The west side is almost complete (Sep 5, 2019)]][[File:2019-09-06 12.17.36.png|left|thumb|392x392px|The main building exterior is complete. (Sep 6, 2019)]]
[[File:2019-09-05 18.10.13-0.png|thumb|302x302px|The west side is almost complete (Sep 5, 2019)]][[File:2019-09-06 12.17.36.png|left|thumb|326x326px|The main building exterior is complete. (Sep 6, 2019)]][[File:2019-09-13 23.21.50.png|thumb|298x298px|The exterior is complete, now to remove the grass platform... (Sep 13, 2019)]]


[[File:2019-09-13 23.21.50.png|thumb|478x478px|The exterior is complete, now to remove the grass platform... (Sep 13, 2019)]]
[[File:Present from Franz 2019-07-28 04.05.23|thumb|301x301px|Tigers Nest map gifted by EggzOnToast, leader of North Korea (July 28, 2019)|none]]The Fishing Pagoda was completed on Dec 2, 2019.
 
[[File:Present from Franz 2019-07-28 04.05.23|centre|thumb|507x507px|Tigers Nest map gifted by EggzOnToast, leader of North Korea (July 28, 2019)]]The Fishing Pagoda was completed on Dec 2, 2019.
[[File:2019-12-03 18.25.23 Fishing Platform.png|none|thumb|559x559px|Safe Fishing with a view, for two]]A monastery bell can now be heard on the path from the Bhutan nation spawn to the monastery.  The bell was installed on May 30, 2020.
[[File:2019-12-03 18.25.23 Fishing Platform.png|none|thumb|559x559px|Safe Fishing with a view, for two]]A monastery bell can now be heard on the path from the Bhutan nation spawn to the monastery.  The bell was installed on May 30, 2020.


Line 68: Line 66:


[[File:2020 0125 Tigers Nest Puppy Dog Shape.jpg|none|thumb|278x278px|Map of Tigers_Nest on Jan 25, 2020.  The fishing pavilion has been built, and only the south side of the lake was claimed. Tigers_Nest is shapped like a puppy.]]
[[File:2020 0125 Tigers Nest Puppy Dog Shape.jpg|none|thumb|278x278px|Map of Tigers_Nest on Jan 25, 2020.  The fishing pavilion has been built, and only the south side of the lake was claimed. Tigers_Nest is shapped like a puppy.]]
[[File:2020-01-28 08.37.08.png|none|thumb|395x395px|The south side of the lake, with the Fishing Pagoda and the shop building.]]
[[File:2020-01-28 08.37.08.png|none|thumb|270x270px|The south side of the lake, with the Fishing Pagoda and the shop building.]]
[[File:2020 0203 Tigers Nest Claims.jpg|none|thumb|382x382px|Map of Tigers_Nest after additional claims on Feb 3, 2020..  The flat north side was claimed to become embassies,  shops,  or residences.  All the land around the lake is claimed.]][[File:2019-10-13 15.41.01.png|none|thumb|635x635px|Tiger's Nest Exterior at Sunrise]]
[[File:2020 0203 Tigers Nest Claims.jpg|none|thumb|241x241px|Map of Tigers_Nest after additional claims on Feb 3, 2020..  The flat north side was claimed to become embassies,  shops,  or residences.  All the land around the lake is claimed.]][[File:2019-10-13 15.41.01.png|none|thumb|635x635px|Tiger's Nest Exterior at Sunrise]]


=='''Diplomacy'''==
=='''Diplomacy'''==