Nova:Transcontinental Ice Rail (TCIR): Difference between revisions

From EarthMC
Jump to navigation Jump to search
>Evanhou
mNo edit summary
>Evanhou
(added)
Line 24: Line 24:
[[File:2019-11-02 20.54.59.png|thumb|220x220px|People from all around the world left a sign at the descending station]]
[[File:2019-11-02 20.54.59.png|thumb|220x220px|People from all around the world left a sign at the descending station]]
Now further planning is working in progress. Second stage of construction planned to reach [[Australia]] and the third stage of construction planned to reach the [[North America]]. Both section will be in progress at the same time. 
Now further planning is working in progress. Second stage of construction planned to reach [[Australia]] and the third stage of construction planned to reach the [[North America]]. Both section will be in progress at the same time. 
== Design ==
== Routes ==
{| class="article-table"
!Station
!Location
!Belonging Nation
!Axis (X)
!Axis (Y)
!Axis (Z)
!Notes
|-
|Macau
|Macau
|Han
|20490
|43
|<nowiki>-</nowiki>
|Station not completed yet
|-
|Changsha Main St.
|Changsha
|Han
|20490
|43
|<nowiki>-5200</nowiki>
|Transfer station for 長蘇線
|-
|Changsha inner St.
|Changsha
|Han
|20490
|43
|<nowiki>-5300</nowiki>
|Not open to public currently
|-
|Changsha North St.
|Changsha
|Han
|20490
|85
|<nowiki>-5375</nowiki>
|Descending / Ascending station
|-
|Changde
|Yiyang
|Han
|20490
|85
|<nowiki>-5530</nowiki>
|
|-
|ChinaTown
|ChinaTown
|Han
|20490
|85
|<nowiki>-5780</nowiki>
|Wilderness
|-
|Sui_Zhou
|Sui_Zhou
|Han
|20490
|85
|<nowiki>-6100</nowiki>
|Transfer station for Sui_Zhou subway . Wilderness
|-
|Xianyang
|Xianyang
|Qin (disbanned)
|20490
|85
|<nowiki>-6625</nowiki>
|Wilderness
|-
|Ascending / Descending St.
|<nowiki>-</nowiki>
|<nowiki>-</nowiki>
|20490
|85-105
|<nowiki>-6700</nowiki>
|Wilderness
|-
|Taiyuan
|Taiyuan
|Long_cheng
|20490
|105
|<nowiki>-7150</nowiki>
|Wilderness
|-
|ShouZhou
|<nowiki>-</nowiki>
|<nowiki>-</nowiki>
|20490
|105
|<nowiki>-7525</nowiki>
|Transfer station for Xinjiang line . Wilderness
|-
|Ereen Hot
|<nowiki>-</nowiki>
|<nowiki>-</nowiki>
|20490
|105
|<nowiki>-7660</nowiki>
|Abandon station . Wilderness
|-
|Mongolia
|<nowiki>-</nowiki>
|Mongolia
|20490
|105
|<nowiki>-8350</nowiki>
|Wilderness
|-
|Northern Mongolia
|<nowiki>-</nowiki>
|Mongolia
|20490
|105
|<nowiki>-8750</nowiki>
|End / Start of the blue ice rail
Start / End of the packed ice rail
Wilderness
|-
|Siberian blvd. 1
|<nowiki>-</nowiki>
|<nowiki>-</nowiki>
|20490
|105
|<nowiki>-9700</nowiki>
|Siberian blvd. Wilderness
|-
|Siberian blvd. 2
|<nowiki>-</nowiki>
|<nowiki>-</nowiki>
|20025
|105
|<nowiki>-10040</nowiki>
|Siberian blvd. Wilderness
|}
== Difficulties ==

Revision as of 21:09, 3 March 2020

Flag Of Transcontinental Ice Rail in Ponsacco sponsor shop

Template:Ice Rail

About

The Transcontinental Ice rail (TCIR) is a ice rail route connecting continents on EMC in the overworld. With the length of approximately 20 kilometer, from Macau(Han) to Red_Moscow(Tzarist_Russia). It provide high speed and time saving transportation between Asia and Europe without teleportation. It’s the longest ice rail on the entire server, and now it’s even planning to go further to the US and Australia. The founder – evanhou said “You can enjoy the server more by taking the ice rail instead of teleporting.”

Construction

Xianyang tunnel 1 during construction

TCIR started its construction on 8.July.2019 (two days after evanhou first join the server) permitted by XxSlayerMCxX (the mayor of Changsha). 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (The day before Qin disband), connecting Changsha and XianYang (1.2 kilometer).

Siberia Section during construction (Siberia blvd. station (lake baikal))

After Qin disband, Han took over China, the Mongolia section and Macau section was permitted by Shia_Chan (Empress). Soon after, the Mongolia section was completed and the Macau section was put in hold due to Macau mayor’s opinion. The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by Manchuria Infrastructure Team (MIT)  and started its construction right away. Took only 2 days (30 hours of work) the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server.

Ice Rail route going through the Mongolia desert

The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. 

Patrolling the ice rail in the Siberian forest during snow

In December, the construction was nearly stopped due to evanhou’s college entrance exam. But thanks to Slayer, the pillars and another lane of the ice rail was able to keep on going for 3 kilometers. And the rest of the part is later been completed by evanhou. On 9.Feb.2020 The Transcontinental Ice Rail Asia-Eastern Europe Section was finally fully completed, and the whole server receive the following message “After nearly half year of hard work The Transcontinential Ice Rail Asia—Eastern Europe section (start from Changsha(Han) to Ponsacco(Tzarist_Russia))is finally complete. The trip is nearly 20km and takes less than 10mins GG!!!” 

People from all around the world left a sign at the descending station

Now further planning is working in progress. Second stage of construction planned to reach Australia and the third stage of construction planned to reach the North America. Both section will be in progress at the same time. 

Design

Routes

Station Location Belonging Nation Axis (X) Axis (Y) Axis (Z) Notes
Macau Macau Han 20490 43 - Station not completed yet
Changsha Main St. Changsha Han 20490 43 -5200 Transfer station for 長蘇線
Changsha inner St. Changsha Han 20490 43 -5300 Not open to public currently
Changsha North St. Changsha Han 20490 85 -5375 Descending / Ascending station
Changde Yiyang Han 20490 85 -5530
ChinaTown ChinaTown Han 20490 85 -5780 Wilderness
Sui_Zhou Sui_Zhou Han 20490 85 -6100 Transfer station for Sui_Zhou subway . Wilderness
Xianyang Xianyang Qin (disbanned) 20490 85 -6625 Wilderness
Ascending / Descending St. - - 20490 85-105 -6700 Wilderness
Taiyuan Taiyuan Long_cheng 20490 105 -7150 Wilderness
ShouZhou - - 20490 105 -7525 Transfer station for Xinjiang line . Wilderness
Ereen Hot - - 20490 105 -7660 Abandon station . Wilderness
Mongolia - Mongolia 20490 105 -8350 Wilderness
Northern Mongolia - Mongolia 20490 105 -8750 End / Start of the blue ice rail

Start / End of the packed ice rail

Wilderness

Siberian blvd. 1 - - 20490 105 -9700 Siberian blvd. Wilderness
Siberian blvd. 2 - - 20025 105 -10040 Siberian blvd. Wilderness

Difficulties