Nova:Transcontinental Ice Rail (TCIR): Difference between revisions
>Evanhou No edit summary |
>Evanhou |
||
| Line 20: | Line 20: | ||
16.Aug.2019 The China-Mongolia section is done. | 16.Aug.2019 The China-Mongolia section is done. | ||
28.Aug.2019 The Siberia second was “temporary” done (1 lane only) and reached Ponsacco St. | |||
17.Oct.2019 evanhou officially start it's Ice rail shop business at Changsha and Ponsacco. | 17.Oct.2019 evanhou officially start it's Ice rail shop business at Changsha and Ponsacco. | ||
| Line 45: | Line 47: | ||
=== '''Siberia section''' === | === '''Siberia section''' === | ||
The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]] and started its construction right away. Took only 2 days (30 hours of work) the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server. | The whole project was in hold for about three weeks in search of further permission and gathering materials. On 27.Aug.2019, the Trans-Siberia section was permitted by [[Manchuria Infrastructure Team (MIT)]] and started its construction right away. Took only 2 days (30 hours of work), the 14 kilometers Trans-Siberia section was “temporary” done(only one lane of ice and cobblestone wall on one side, no pillars for climbing) on 28.Aug.2019, it’s total length was added up 18 kilometers and became the longest ice rail route on the entire server. | ||
[[File:2019-08-26 23.26.09.png|thumb|220x220px|Ice Rail route going through the Mongolia desert]] | [[File:2019-08-26 23.26.09.png|thumb|220x220px|Ice Rail route going through the Mongolia desert]] | ||
The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. | The construction later slow down due to the start of the school. The ice rail is heavily griefed by players which made the construction even more slower cuz fixing the griefs took up all of the time. This phenomenon wasn’t stopped until Slayer became the Mod and be able to roll back all the grief. | ||