Nova:Transcontinental Ice Rail (TCIR): Difference between revisions
>Evanhou |
>Evanhou |
||
| Line 39: | Line 39: | ||
=== '''Start of the construction''' === | === '''Start of the construction''' === | ||
TCIR started its construction on 8.July.2019 (two days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (The day before [[Qin]] disband), connecting [[Changsha]] and [[XianYang]] (1.2 kilometer). | TCIR started its construction on 8.July.2019 (two days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). After 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (The day before [[Qin]] disband), connecting [[Changsha]] and [[XianYang]] (1.2 kilometer). | ||
[[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]] | [[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]] | ||