Nova:Transcontinental Ice Rail (TCIR): Difference between revisions
>Evanhou |
>Evanhou |
||
| Line 3: | Line 3: | ||
Siberia Section : 09.Feb.2020 | Siberia Section : 09.Feb.2020 | ||
Other sections are still working in progress.|Builder(s) = evanhou, XxSlayerMCxX, m51vortice, TR1NITY, Zhengjc , lei_she, landy_zhirui|Patroller = evanhou, XxSlayerMCxX|Departure Station = James Shoal(Hong_Kong)-Macau (Han) - Red-Moscow (Russian_Empire) - Warsaw (Austria)|color = #004EA6}} | Other sections are still working in progress.|Builder(s) = evanhou, XxSlayerMCxX, m51vortice, TR1NITY, Zhengjc , lei_she, landy_zhirui|Patroller = evanhou, XxSlayerMCxX|Departure Station = James Shoal(Hong_Kong)-Macau (Han) - Red-Moscow (Russian_Empire) - Warsaw (Austria)|color = #004EA6}} | ||
'''The Transcontinental Ice Rail''' ('''TCIR''') is a ice rail route connecting | '''The Transcontinental Ice Rail''' ('''TCIR''') (Trans-Siberia Ice Road) is a ice rail route connecting | ||
continents on EMC in the overworld. With the length of approximately | continents on EMC in the overworld. With the length of approximately | ||
26 kilometer, from [[James Shoal]] ([[Hong Kong]]) to [[Red_Moscow]] ([[Russian Empire]]). | 26 kilometer, from [[James Shoal]] ([[Hong Kong]]) to [[Red_Moscow]] ([[Russian Empire]]). | ||
| Line 11: | Line 11: | ||
and [[Australia]]. And it also became a new way for mayors to search for new players in these days. The founder – [[evanhou]] said “When the teleport is broke, TAKE THE ICE RAIL!!!” | and [[Australia]]. And it also became a new way for mayors to search for new players in these days. The founder – [[evanhou]] said “When the teleport is broke, TAKE THE ICE RAIL!!!” | ||
The service is now back. With the population of of the passenger rise, the ice rail is now hardly griefed. The China section has been patrolled by The Chinese Ice Rail Community. But due to evanhou's school work irl and the amount of grief that reported to mods is too big, the maintenance of the Siberia section will be suspended until the mods fixed a single lane. | |||
== Design == | == Design == | ||
[[File:TCIR logo big.png|thumb|235x235px|TCIR Logo|none]] | [[File:TCIR logo big.png|thumb|235x235px|TCIR Logo|none]] | ||
== | == Time Line == | ||
08.Jul.2019 evanhou started the construction | |||
11.Jul.2019 First section of the ice rail is completed (From [[Changsha]] to [[Qin|XianYang]]) | |||
16.Aug.2019 The China-Mongolia section is done. | 16.Aug.2019 The China-Mongolia section is done. | ||
| Line 25: | Line 27: | ||
17.Oct.2019 evanhou officially start it's Ice rail shop business at Changsha and Ponsacco. | 17.Oct.2019 evanhou officially start it's Ice rail shop business at Changsha and Ponsacco. | ||
09.Feb.2020 The Siberia section is | 09.Feb.2020 The Siberia section is entirely completed. First stage of the construction complete. | ||
15.Jul.2020 EVERGREEN was founded by evanhou, and the Ice rail became a part of the company. | 15.Jul.2020 EVERGREEN was founded by evanhou, and the Ice rail became a part of the company. | ||
| Line 31: | Line 33: | ||
02.Sep.2020 evanhou made a announcement that EVERGREEN and Eva Air will stopped it's service till the Turmoil Era of the server is over. | 02.Sep.2020 evanhou made a announcement that EVERGREEN and Eva Air will stopped it's service till the Turmoil Era of the server is over. | ||
28.Mar.2021 The 1.16 | 28.Mar.2021 The server updated to 1.16 and the render distance became further, which means we're finally able to travel on the ice rail at full speed again. | ||
18.May.2021 evanhou made a discord of the TCIR group, and decide to make plan for the further route. | 18.May.2021 evanhou made a discord of the TCIR group, and decide to make plan for the further route. | ||
11.Jul.2021 The construction of the TCIR Headquarter is completed | |||
== Construction == | == Construction == | ||
| Line 39: | Line 43: | ||
=== '''Start of the construction''' === | === '''Start of the construction''' === | ||
TCIR started its construction on 8.July.2019 ( | TCIR started its construction on 8.July.2019 (2 days after [[evanhou]] first join the server) permitted by [[XxSlayerMCxX]] (the mayor of [[Changsha]]). After 4 days into construction, the first section of the ice rail was completed on 11.July.2019 (The day before [[Qin]] disband), connecting [[Changsha]] and [[Qin|XianYang]] (1.2 kilometer). | ||
[[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]] | [[File:2019-08-27 21.38.41.png|thumb|220x220px|Siberia Section during construction (Siberia blvd. station (lake baikal))]] | ||