Classic:Alania Metro
Jump to navigation
Jump to search
History
Founded on 27/01/2018 to build and run the Metro rail system under Alania
Lines
Armenian Line
First constructed part of the Alania Metro, linking the Grand Terminal at the Alania Square with Yerevan and then with the Western Armenian City.
Tbilisi Line
Second line built, links the Grand Terminal with the former town of Tbilisi and then extending on to the Black Sea.
Castle Line
Third Line built, runs from the Grand Terminal underneath the Eastern sections of Alania and continues to the Alanian Castle.
Mountain Line
Last line built, runs from the Grand Terminal northwards to an Alanian outpost just north of Alania.