Nova:Mossow-New Snork Iceway: Difference between revisions

>Wediaklup
No edit summary
mNo edit summary
 
(16 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Iceway|completion_date=25th February 2020|patroller=[[File:Diamant.png|20px]] [[DiamantAxt9494]]
{{Iceway|completion_date=25th February 2020|patroller=[[File:Diamant.png|20px]] [[DiamantAxt9494]]
[[File:AurelNeu.png|20px]] [[_Rilex_]]|nations={{KAPSKFlag}} KAPSK
[[File:AurelNeu.png|20px]] [[_Rilex_]]|nations={{KAPSKFlag}} KAPSK
Wilkesland|continent=Antarctica|level=Bridge, Tunnel|type=International|builders=[[File:Diamant.png|20px]] [[DiamantAxt9494]]|total_distance=380 Blocks|stations=3|row12=[[File:Platzhalter1.png]]{{eSTR}} <small>[[Treiberstrecke]]</small>
Wilkesland|continent=Antarctica|level=Bridge, Tunnel|type=International|builders=[[File:Diamant.png|20px]] [[DiamantAxt9494]]|total_distance=380 Blocks|stations=3}}
{{qBHFe}}{{IWTriL}} [[New Snork]]
 
{{STRUR}}{{euABZor}} <small>Realignment May 2021</small>
 
{{IWTrack}}{{eBHF}} <span style="color:#868686;">''Küste/Coast''</span>
 
{{IWHST}}{{eSTR}} [[Mossow]]–Küste
 
{{IWTrack}}{{eSTR}} <span style="color:#868686;">''Stairs to the Ground''</span>
 
{{IWHST}}{{eSTR}} [[Mossow]] Platz der Union
 
{{STROR}}{{eoABZul}}
 
[[File:Platzhalter1.png]]{{IWStation}} [[Mossow]] East
 
{{PfL}}{{MosJunE}}{{PfR}} [[Mossow-Neverwinter Iceway|'''Mossow–Neverwinter Iceway]]}}


The '''Mossow-New Snork Iceway''' is a branching ice road from the [[Mossow-Neverwinter Iceway]]. It was built between January 2020 and 25th February 2020 by [[DiamantAxt9494]]. The iceroad connects the town of [[New Snork]] and the [[KAPSK]]-capital [[Mossow]]. The route also uses the Mossow Ice Road Tunnel.
The '''Mossow-New Snork Iceway''' is a branching ice road from the [[Mossow-Neverwinter Iceway]]. It was built between January 2020 and 25th February 2020 by [[DiamantAxt9494]]. The iceroad connects the town of [[New Snork]] and the [[KAPSK]]-capital [[Mossow]]. The route also uses the Mossow Ice Road Tunnel.
Line 24: Line 7:
==Route==
==Route==
The route starts in New Snork on Y 167 where it goes to the East for 60 blocks. There it reaches the [[Wilkesland]]/[[KAPSK]] border and short after the Coast Junction where it turns South. The junction is followed by the Station [[Küste|Coast]] which, unsurpriseingly, lies on the Antarctic coast.  Going about 340 Blocks further South the route enters the Mossow Ice Road Tunnel through an elevator. A few blocks further the route reaches the first station in [[Mossow]]: [[Mossow East]]. A few metres south of [[Mossow East]] the route merges into the [[Mossow-Neverwinter Iceway]].
The route starts in New Snork on Y 167 where it goes to the East for 60 blocks. There it reaches the [[Wilkesland]]/[[KAPSK]] border and short after the Coast Junction where it turns South. The junction is followed by the Station [[Küste|Coast]] which, unsurpriseingly, lies on the Antarctic coast.  Going about 340 Blocks further South the route enters the Mossow Ice Road Tunnel through an elevator. A few blocks further the route reaches the first station in [[Mossow]]: [[Mossow East]]. A few metres south of [[Mossow East]] the route merges into the [[Mossow-Neverwinter Iceway]].
{{RouteChart
|symbols=[[File:Platzhalter1.png]]{{eSTR}} <br /> {{qBHFe}}{{eoABZul}} <br /> {{STRUR}}{{euABZor}} <br /> {{IWTrack}}{{eBHF}} <br /> {{IWHST}}{{eSTR}} <br /> {{IWTrack}}{{eSTR}} <br /> {{IWHST}}{{eSTR}} <br /> {{STROR}}{{eoABZul}} <br /> [[File:Platzhalter1.png]]{{IWStation}} <br /> {{PfL}}{{MosJunE}}{{PfR}}
|text=<small>Treiberstrecke</small> <br /> [[New Snork]] <br /> <small>Realignment May 2021</small> <br /> <span style="color:#868686;">''Küste/Coast''</span> <br /> [[Mossau]] Arbeiterpiazza <br /> <small><span style="color:#868686;">''Stairs to the Ground''</span></small> <br /> [[Mossau]] Platz der Union <br /> &nbsp; <br /> [[Mossau]] Ostkreuz <br /> [[Nova:Mossow-Neverwinter Iceway|Mossow-Neverwinter Iceway]]}}


==History==
==History==
Line 40: Line 27:
In Late February 2021 the ice road to [[Küste|Coast]] which was still lying above surface was also upgraded to a 3-block-wide two lane system.
In Late February 2021 the ice road to [[Küste|Coast]] which was still lying above surface was also upgraded to a 3-block-wide two lane system.
<br />
<br />
[[Category:Infrastructure]]
[[Category:Infrastructure]]
[[Category:Iceways (Nova)]]
[[Category:KAPSK]]
[[Category:KAPSK]]
[[Category:Casey]]
[[Category:Volksbundesbahnen]]